2019
Delivery of switchboard, drives and gearboxes for sintering belts "B" at the agglomeration.
Switchboards.
Measurement of resistance of wheelsets.
Implementation documentation, SW, wiring, machine construction, putting into operation.
Heating and drying pouring tundish for continuous casting equipment - 3pcs.
Implementation documentation, SW, wiring, cabling, switchboards, installation, putting into operation.
Repair of straightening conveyor drives.
Implementation documentation, SW, wiring, cabling, switchboards, installation, putting into operation.
Wiring for tumble sawdust dryer - 3pc.
Implementation documentation, SW, wiring, cabling, switchboards, installation, putting into operation.
Measurement of wire coil diameter by cameras on wire track.
Implementation documentation, SW, wiring, cabling, switchboards, installation, putting into operation.
Project documentation of the sand storage hall lighting.
Implementation documentation.
2018
Liner line "Kernovka"
Project documentation, SW, installation, cabling, switchboards, commissioning
Repair of control system of the kiln section on the HCC line
Installation, cabling, switchboards, commissioning
Repair of control system on cabins of medium-fine rolling mill
Installation, cabling, switchboards, commissioning
Delivery of switchgear, drives and gearboxes for sintering belts in the coking plant
Switchboards
Control system of accumulation station for hydraulic power unit
Installation, cabling, switchboards, commissioning
Heating and drying the pouring pan for continuous casting equipment
Project documentation, SW, installation, cabling, switchboards, commissioning
Measurement of ohmic resistance of wheelsets
Project documentation, SW, installation, commissioning
Project documentation for sand traffic management for glass production
Project documentation
Line laser repair and displacement bar position measurement
Installation, cabling, switchboards, commissioning
PS2 Reel Control Reconstruction
Project documentation, SW, installation, cabling, switchboards, commissioning
Electrical installation of the hydraulic aggregate - Romania
Project documentation, switchboards, cabling and commissioning
Technical documentation of the Bonatrans petrol station
Project documentation
2017
Detection of spikes on a medium-rolling mill line
Project documentation, SW, installation, cabling, switchboards, commissioning
Control system of slabs chain carrier – Třinecké železárny
Project documentation, SW, installation, cabling, switchboards, commissioning
Repairs of coking oven wireless communication
Project documentation, installation, cabling, switchboards, commissioning
Cooling circuits technical documentation – Měř Povrly
Project documentation
Relocation of hose reels
Project documentation, SW,installation, cabling, switchboards, commissioning
Rubber 3-Cylinder Calender electric installation repair
Project documentation, installation, cabling, switchboards, commissioning
Ultrasonic bath implementation into the casting line
Project documentation, installation, PLC HW, HMI, cabling, switchboard, commissioning
Rolling mill kvarto operators’ cabs Repair
Project documentation, installation, cabling, switchboard, commissioning
Replacement of the carousel drive control
Project documentation, installation, cabling, switchboard, commissioning